Industrial buildings

Class A Warehouse USKO International, Almaty

Design and construction works


Total area: 3,727 m2


Building volume: 37,564 m3


Year built: 2004


Price: 9,668,000 tenge


Building frame: metal


The roof, walls: sandwich panels


Windows: reinforced plastic


Floors: reinforced concrete B12.5 and B15


Finish: painting with fire-resistant dyes


Engineering support: air-conditioning, automatic fire alarm, fire-fighting water supply line, security alarm.

Ak Bulak Ski Resort, Talgar district

Construction of the hangar for specialized equipment, construction of the cable car terminal stations, bridges, ladder stained glass and landscaping.

 

Building volume: m3

 

Year built: 2005-2007

 

Cost: 92,000,000 tenge

 

Frame of the building: reinforced concrete

 

Roof: metal tile roofing

 

Doors, windows: reinforced plastic

 

Finish: Alucobond

 

Pavement: colored cement-sand paving slabs

Warehouse and Logistics

Office furniture

Construction

Heating systems